conducting a test inspection of natural ventilation systems (ducts) at the site "60-apartment residential building No. 7 according to the general plan of multi-apartment residential development in the Kolos microdistrict in Bykhov (stage 2) with improvement of the adjacent territory (stage 1 of construction - 20 apartments)" (residential building, improvement), conducting laboratory and instrumental studies of noise parameters (elevator equipment) at the site "60-apartment residential building No. 7 according to the general plan of multi-apartment residential development in the Kolos microdistrict in Bykhov (stage 2) with improvement of the adjacent territory (stage 1 of construction - 20 apartments)" (residential building, improvement)
Plano de Aquisições
Tentamos o melhor possivel ter informações corretas e atuais disponíveis no nosso web site, porêm não podemos garantir que toda informação esteja sem erros.
Se você tiver alguma sugestão de atualizações/correções para este aviso, favor entrar em contato.