Oceanographic Survey And Submission Of Report As Perannexure 1 Section A , Engineering Design Fabricationdrawings Selection Of Components Towing Installation Anddeployment Methodology Detailed Design Report Submissionas Per Annexure 1 Section B To H , Supply Of Power Take Offsystem Pto As Per Annexure 1 Section C , Supply Of Floatingplatformand Mooring System To The Site As Per Annexure 1Section D , Assembly, Integration And Commissioning Of Theunit As Per Annexure 1 Section E , All Risk Insurance For Themen And Materials Till Completion Of Commissioning As Perannexure 1 Section F , Transportation For Men And Materialsincluding Transit Insurance As Per Annexure 1 Section G ,Operation And Maintenance Charges Period For 1St Year Asper Annexure 1 Section H , Operation And Maintenancecharges Period For 2Nd Year As Per Annexure 1 Section H Quantity: 9 (EXPIRED)
Pedido de Propostas
Tentamos o melhor possivel ter informações corretas e atuais disponíveis no nosso web site, porêm não podemos garantir que toda informação esteja sem erros.
Se você tiver alguma sugestão de atualizações/correções para este aviso, favor entrar em contato.
