Dismantling Of 3 Elevators, Heating And Sanitary Facilities, Installation Of Siphons And Gutters (120Ml), Buried Tubes (255Ml). Protection Work On The Protected Building And Demolition And Partial Shoring (+-300M2), Masonry (+-130M2). Earthworks (+-1100M3) With Excavation Shielding On One Side Of A Building (+-35Ml), Concrete And Reinforced Concrete Work (+-1100M3), Metal Construction Work For A Footbridge (+-8200Kg) Connecting Two Buildings, Wooden Construction Work For A New Floor (+-100M3) On An Existing Building. Waterproofing, Insulation And Drainage Work Around Buildings: Coating Work (+-850M2), Exterior Development Work (Eu And Ep Pipes, Wet And Dry Networks, Finishes And Surroundings) With Clearing And Planting. The Duration Of The Work Is 250 Working Days, Starting In The Second Half Of 2026. The Work Is Awarded At Unit Prices.
Pedido de Propostas
Tentamos o melhor possivel ter informações corretas e atuais disponíveis no nosso web site, porêm não podemos garantir que toda informação esteja sem erros.
Se você tiver alguma sugestão de atualizações/correções para este aviso, favor entrar em contato.
