Busca

In order to eliminate the difficulty in supplying water from the Alijan River to the Arab Canal, major repair of 1 fixer (L2=60.0 pm) in the Alijan River, excavation of soil with excavators with a capacity of 0.65 (0.5-1) m3 of Chalovu by loading it into dump trucks, soil group: 3 (excess soil from digging) Dump truck, 20 t transportation distance - 3 km. 1st-class load Execution of works on the site of soil spillage, soil group: 2-3 Excavation of soil with excavators with a bucket capacity of 0.65 (0.5-1) m3 by loading it onto dump trucks, soil group: 4 (water level release by means of a pump 365 mash-hours) in trenches with a width of more than 2 m and a cross-sectional area of up to 5 m2 manual digging of soil in pits with fastenings, depth of trenches and pits up to 2 m, group of soil: 4 (manual digging after excavator) Excavation by transporting soil up to a distance of 10 m, bulldozer power: 96 (130) kW (hp), group 4 soil (cleaning of the construction site)

Pedido de Propostas

Informação Geral

   24 de Jun, 2026
  
   Outro
   publicado: 24 de Jun, 2026

Texto original

Ana səhifə Müsabiqə elanları Açıq tender (e-tender) "Ərəb kanalına Əlican çayından suyun verilməsində yaranmış çətinliyin aradan qaldırılması məqsədi ilə Əlican çayında 1 ədəd fiksatorun ( L2=60,0 pm) əsaslı təmiri" "Ərəb kanalına Əlican çayından suyun verilməsində yaranmış çətinliyin aradan qaldırılması məqsədi ilə Əlican çayında 1 ədəd fiksatorun ( L2=60,0 pm) əsaslı təmiri" Ümumi məlumat...
Opções de assinatura

Básico

Completo

Corporativo

US$ 550,00/ano

US$ 1.000,00/por ano

Custo mediante solicitação

Comprar Comprar Fale conosco
Favor notar que este aviso é somente para sua informação.
Tentamos o melhor possivel ter informações corretas e atuais disponíveis no nosso web site, porêm não podemos garantir que toda informação esteja sem erros.
Se você tiver alguma sugestão de atualizações/correções para este aviso, favor entrar em contato.